HMS Albion is a Landing Platform Dock (LPD) and was launched at Barrow-in-Furness in March 2001.
The ship’s roles are to act as the afloat command platform for the Royal Navy’s Amphibious Task Force and Landing Force Commanders when embarked and to embark, transport, deploy and recover troops with their equipment and vehicles which form part of an amphibious assault force.
The radar systems on HMS Albion are cooled by a York International refrigeration system, which is absolutely key whilst the vessel is operating in the hot Gulf conditions.
The refrigeration systems are very compact and the pumps are packaged right in the heart of the system surrounded by pipe work. The original pumps were manufactured by Girdlestone Pumps and only these will fit without a lot of modification.
Major maintenance task
Removing the pumps from the system for maintenance is a major task involving partial dismantling of the cooler pipe work and having to lift the pumps over a lot of obstacles with limited headroom because of the deck above in order to carry out major maintenance work.
If there was a significant failure of the pumps the consequences are significant. The vessel can bring other pump assets on line to help but that degrades other systems elsewhere. Therefore reliability of the pumps is paramount to reduce any unplanned maintenance.
Lack of support
During a recent scheduled maintenance visit at Devonport, the original four pumps were due for renewal. However the current owner of the Girdlestone pump operation was not prepared to assist to the satisfaction of the MOD, either with technical advice or replacement equipment within the time and budget required.
Amarinth had previously supported the MOD in overcoming seal problems with the pumps resulting from operating in shallow seas with high sand content. Babcock Marine once again turned to Amarinth to see how the company could assist.
Full interchangeability
There are many pump users looking to replace their existing Girdlestone pumps without resorting to major modifications and so Amarinth has designed a number of its pumps to be dimensionally and hydraulically interchangeable with their original Girdlestone pumps.
Amarinth’s N Series close coupled motor pump was selected to replace the four existing Girdlestone 920 motor pumps on HMS Albion.
Returned to duty on time
The replacement pumps exactly fit the footprint of the existing ones and so no modifications to any pipework, fittings or electrics were needed within the confined space that was available. This was a major benefit to Babcock Marine, enabling it to complete the scheduled maintenance on-time and return the vessel to service without any delay.
Amarinth subsequently assisted with the commissioning providing rapid after sales support regarding an issue with the motor power.
The alternative to fitting Amarinth's pumps would have resulted in significant delays to the refurbishment of the cooling unit in addition to a period of “de-snagging” post completion of the installation which would be far from ideal on such a critical process. Amarinth will continue to work with Babcock and the MOD on other Girdlestone pump refurbishments project.