INEOS

On-going issues

In 1999 BP had three acetic acid pumps installed at its 500ktpa Vinyl Acetate Monomer (VAM) production plant at Saltend near Hull, UK.
From day one of the operation of the plant the pumps experienced failures with the shaft breaking at the impeller joint. Thereafter the failures continued to occur on a monthly basis causing significant downtime for the plant.

Over a decade BP replaced numerous shafts and impellers and tried alternative solutions in a vain attempt to increase mean time between failures (MTBF), including changing the impeller fixing design on more than one occasion. Although these made slight improvements to the running time, the primary fault of cavitation and catastrophic failures continued.

Investigation

After INEOS acquired the plant in 2008, Amarinth’s UK Sales Manager instigated a visit to examine the stripped down pumps in the workshop and discuss the current requirements against the original data sheets.

Amarinth quickly identified that the design integrity of the pumps had been compromised and offered to review the original technical data, design and process duty. Initial conclusions however were inconclusive, as based on the original datasheet the pump design should have been adequate for the duty.

Subtle but crucial discrepancy

To understand why the pumps were failing, Amarinth proposed a combined review approach involving the VAM Plant Mechanical Engineer and VAM Operations Engineer to investigate the plant operating conditions in more detail.

The data collected was studied by Amarinth engineers and a subtle but crucial discrepancy was identified between the original duty datasheets and the actual operating conditions. The supply temperature into the pump was 133C, but the datasheet requested 125C.

This difference was critical to the pumps operation because under the pressure of the process the acetic acid will start to vapourise at 125C. The original design had assumed the acetic acid would stay as a liquid given the stated supply temperature of 125C whereas at 133C it was vaporising causing pump cavitation and subsequent failure.

Re-design saves on new pumps

On reviewing the pump design with this new data, Amarinth concluded that replacement pumps were not necessary and that the original pumps and systems could be modified to cope with the operating conditions, a significant cost saving to INEOS.

After a joint review of the operating conditions, Amarinth suggested that INEOS increase the rate of recirculation to cool the temperature of the acid at the pump inlet, which also enabled the pump to operate nearer its best effi-ciency point (BEP) than at present. Amarinth also modified one of the spare casings to ensure it was totally interchangeable with the installed runner and stand-by pumps.

Since Amarinth’s recommendations have been put into practice, the pumps have been in service for over a year on a monthly changeover cycle with no failures to date. Previously a MTBF of three weeks was the norm.

effects of fluid temperature on NPSH graph
Featured image

INEOS

INEOS is a global manufacturer of petrochemicals, specialty chemicals and oil products.

The group comprises 15 businesses each with a major chemical company heritage. Its production network spans 60 manufacturing facilities in 13 countries throughout the world INEOS employs 15,500 people and has sales approaching $45bn and it is the largest privately owned company in the United Kingdom.


The support and experience Amarinth provided throughout this issue resulted in both a cost effective and more reliable pump solution. Amarinth's support and desire to help identify the root cause of the failure was their strength. They concentrated on the crucial factors of our challenge to help resolve what had been a long standing problem.

Alan Brattan
VAM Plant Mechanical Engineer
INEOS

Download PDF

Accreditations and memberships

Amarinth is independently verified by, accredited to or members of the following:


View All

Bentwaters Parks, Rendlesham, Woodbridge, Suffolk IP12 2TW. United Kingdom
tel: +44 (0)1394 462 120     fax: +44 (0)1394 462 130
e‑mail: enquiries@amarinth.com     web: https://www.amarinth.com


Page printed from: https://www.amarinth.com/library/amarinth-identifies-critical-discrepancies-in-process-temperature-affecting-npsh-saving-ineos-the-cost-of-replacement-pumps