How to install and align a pump and motor coupling on an API 610 VS4 pump


Correctly install and align an API 610 VS4 vertical sump pump coupling between the pump shaft and pump motor following removal to minimise vibration during operation.

Required Tools

Tools

Gloves
Phillips screw driver
Engineers square
Internal calipers
Spanner - 10mm
Nylon hammer
Allen keys
Ruler
Torque wrench - 19mm socket