Case studies | ||
2013 | ||
| Amarinth undertakes three-way consultation project to develop small footprint pump and seal support system for Quad 204 FPSO. Amarinth successfully delivers API 610 OH2 super duplex pumps to the Quad 204 FPSO and is then recommended by BP to Hyundai Heavy Industries to supply API 610 VS4 pumps. | May-13 | A |
| Amarinth design uprated API 610 pumps on innovative baseplate for ADMA-OPCO on the ZCSC De-mothballing Project. Amarinth design new innovative base plate to support ADMA-OPCO on the de-mothballing project at the Zakum Central Super Complex which allowed for new API 610 OH2 pumps to fit within the platform without any alterations to the connecting pipe work. | Apr-13 | A |
| Amarinth sets new standard in ZADCO for API 610 VS4 pumps with new bearing flush monitoring system. Amarinth designed a bespoke flow detection system with automatic shut-down to ensure the API 610 VS4 pumps could not be started until flow to the bearings was established and in turn helped ZADCO to determine a new standard for pump operating. | Jan-13 | A |
2012 | ||
| Amarinth's integrated end-user approach delivers significant cost and time savings to ADCO for its Sahil, Asab & Shah Full Field Development project. Amarinth's previous experience of supplying API 610 pumps for the Sahil, Asab & Shah Full Field Project for ADCO and its awareness of the client technical specifications ensured the contract was delivered on time with controlled cost management. | Dec-12 | A |
| Amarinth's forward planning and close working relationship with Cyclotech Limited ensures savings in cost and time on project. Amarinth's experience in recognising the cost of change during a project contract life cycle ensures all specificaitons are fully addressed during detailed customer 'kick-off' meeting. | Nov-12 | A |
| Amarinth designs bespoke 13m VS4 pump for Kumul Oil Platform project Amarinth designs bespoke 13m VS4 open drain pumping solution for Kumul Oil Platform ‘Topside’ rejuvenation project located in the Gulf of Papua | Sep-12 | A |
| Amarinth identifies critical discrepancies in process temperature affecting NPSH saving INEOS the cost of replacement pumps Amarinth quickly identified that the design integrity of the pumps had been compromised and that there were critical discrepancies in the process temperature affecting the NPSH. | Aug-12 | A |
| Amarinth provides 40 centrifugal pumps with innovative design features for the Artlant Mega PTA plant Amarinth provides 40 centrifugal pumps with innovative design features for the Artlant Mega PTA plant in Portugal | Mar-12 | A |
2011 | ||
| Amarinth provide low shear centrifugal process pumps with innovative document management and over-the-web witness testing From initial enquiry, through management of contractual documentation approvals, and then witness pump testing over the web, Amarinth use modern technology to ensure rapid delivery of API 610 pumps to Larsen & Toubro in India | Feb-11 | A |
| Looking back at the rapid growth of Amarinth in the pump industry Mike Williams of Digistep Ltd , an independant inspection consultancy, looks back at the rapid growth of Amarinth from the eyes of a visiting inspector | Jan-11 | A |
2010 | ||
| Amarinth’s web document management system ensures urgent API 610 project is delivered on time including all supporting documents Amarinth's new & innovative web based documentation system ensure a speedy delivery for two API 610 booster pumps by keeping on top of contractual; documentation approvals and providing Calder & their end user access to the latest documents 24 hours a day. | Nov-10 | A |
| Confidence & business grow rapidly with Maersk as Amarinth proves its credentials in the offshore API 610 pumping environment Maersk were one of the first companies to purchase spares from Amarinth when it strated up in 2003. Now, seven years later Amarinth have upgraded & supplied a number of new pumps to platforms in the North Sea and have recently won a single source supply agreement for replacement Girdlestone spare parts. | Jul-10 | A |
| Amarinth assists Galfar in supplying API 610 VS4 vertical sump pumps to ADCO to create environmentally friendly closed drains system Amarinth assist Galfar supply ADCO a cost effective solution for ten VS4 sump pumps which feed OH6 high speed, high head pumps instead of using multi stage in-tank pumps. The solution was to make the existing burns pits more environmentally friendly. | Jun-10 | A |
| Amarinth delivers API 682 Plan 53C technology to ensure reliable seal performance against tight deadlines & stringent DEP specifications Amarinth assist Petreco Process Systems with upgrade to the Auk Alpha Shell platform in the North Sea supplying a compensating seal support system commonly known as an API Plan 53C & explains the reasons why this was chosen. | May-10 | A |
| Amarinth keeps critical cooling process running aboard HMS Albion with it's N Series close coupled pumps Amarinth replace existing Girdlestone 920 motor pumps for Radar cooling system aboard HMS Albion, using it's own hydraulically & dimensionally interchangable N Series close coupled pumps | Jan-10 | A |
| Amarinth deliver cost effective process improvement project through its unique ability to interchange with Girdlestone Pumps Amarinth assist British Sugar PLC with a process improvement project saving over £10K. by upgrading two existing Girdlestone Pumps and offering two idential Amarinth C Series pumps which are hydraulically & dimensionally interchangable | Jan-10 | A |
2009 | ||
| Amarinth deliver high specification, low NPSH API 610 pumps on short leadtimes to Cyclotech for FPSO Espirito Santos Amarinth supplies low shear API 610 pumps to minimise any emulsification of the oil and water before it enters the filtration units on FPSO in BC-10 deep water field development in the Campos Basin offshore Brazil | Nov-09 | A |
| Amarinth refurbishes API 610 pumps for Apache with tungsten carbide coating Amarinth assist Alderley Systems Ltd refurbish two API 610 OH2 pumps when engrained sand in the well caused excessive erosion for Apache in the North Sea Forties field | Jun-09 | A |
| Amarinth replace Girdlestone pumps at BFS fertilizer plant without disrupting pipework or baseplates Amarinth help BFS upgrade their old Girdlestone URF pumps after 32 years of service by installing the new replacement Amarinth U Series equivalent which slots straight in without pipework modifications. | Apr-09 | A |
| Amarinth supplies low shear centrifugal pumps for use in hydrocarbon separation module in Loango field off Congo Amarinth supply API 610 OH1 B Series centrifugal pumps for low shear application on hydrocarbon separation module for FLSmidth | Feb-09 | A |
| Amarinth develops innovative API 610 vertical sump pump to guard against environmental damage in BTC pipeline Amarinth design bespoke API 610 VS4 vertical sump pump to operate in sub zero weather conditions. The design included a special arrangement for dismantling the 10m long pumps, inside a 3m high building. | Feb-09 | A |
| Speedy visit by Amarinth to the Britannia field enables OSPAR equipment commissioning to proceed to plan Amarinth commission OPSAR pumps with VSD drives on Britannia rig 130 miles north-east of Aberdeen. AMEC were very impressed with the quality & responsiveness of the Amarinth off-shore engineer. | Jan-09 | A |
2008 | ||
| Amarinth refurbishes existing Girdlestone pumps to make them fully ATEX compliant and provide a new lease of life D1 Oils aquired a number of old Girdlestone pumps which they wanted upgraded to ATEX compliance for their new bid fuel production facility. This was seen as the best overall solution to utilise the existing assets & minimise costs & disruption. | Dec-08 | A |
| Amarinth supplies DONG Energy with API 610 OH2 pumps for the environmentally friendly disposal of produced water Amarinth supply three API 610 OH2 pumps complete with 355kW motors driven by variable speed, to help DONG Energy pump their produced water and control their water injection pumps in the Siri field in the North Sea | Oct-08 | A |
| Amarinth delivers high alloy API 610 OH2 A Series pumps for prestigious processing project in the UAE Amarinth and Nama join forces to supply alloy 825 API 610 OH2 process pumps on short delivery for Habshan Gas Complex Expansion in the Middle East. The solution involved extensive NDT & NDE including radiography, type 3.2 certification and PMI | Oct-08 | A |
| Amarinth delivers high alloy API 610 VS4 V Series vertical sump pumps for prestigious processing project in the UAE Amarinth and Nama join forces to supply hastelloy and alloy 825 API 610 VS4 vertical sump pumps to a very demanding pump performance criteria on short delivery for Habshan Gas Complex Expansion in the Middle East. The end user subsequently orders a further three pumps for the same project. | Oct-08 | A |
| Aker FloatingProduction - Amarinth design & supply API 610 OH2 pumping solution for innovative Floating Production Storage and Offloading vessel Amarinth design and supply four API 610 OH2 A Series process pumps complete with API 682 plan 53A seal support systems for innovative SMART FPSO built by Aker Floating Production & leased to Reliance Industries for use in the MA field in the Bay of Bengal | May-08 | A |
| An innovative compact API 610 pumping solution from Amarinth gets Opus out of a tight squeeze Amarinth supply NORSOK compliant API 610 OH1 B Series process pumps for installation in Opus Maxim's Compact Flotation Unit (CFU) upgrade for use in the Danish Sector of the North Sea | Mar-08 | A |
| Amarinth turns the most problematic pump at Polimeri Europa into its most reliable One year on, Amarinth continue to work with Polimeri Europa to make further design enhancements to the agglomerate pumps using FEA analysis. "The pumps have now run for 6 months without cleaning & labour costs are down by 85%" advised Andrew Maxwell | Mar-08 | A |
2007 | ||
| DONG Energy - Amarinth’s speedy response for pump spares keeps the oil flowing in Danish sector of the North Sea Amarinth supply spare parts for Girdlestone pumps on an extremely tight lead-time & win a large pump order on the back of their performance. | Dec-07 | A |
| PALL Corporation - Amarinth work with PALL Corporation and enable Shell to meet OSPAR regulations in the North Sea Amarinth manufacture high alloy NACE compliant C Series pumps with Protect System seal support systems to complete a filtration package enabling Shell to achieve OSPAR compliance in the North Sea | Oct-07 | A |
| Wood Group - Amarinth deliver low NPSH pumping solution enabling Triton FPSO to meet OSPAR regulations Amarinth manufacture B Series low NPSH API 610 compliant process pumps enabling Amerada Hess to achieve OSPAR compliance on the Triton FPSO in the North Sea | Oct-07 | A |
| Pakistan Petroleum - Amarinth adopt new seal technology for demanding LPG application at Pakistan Petroleum Amarinth deliver 10 off API 610 process pumps incorporating John Crane laser faced seals to the Adhi Gas Processing Plant II to handle Liquid Petroleum Gas (LPG) at high suction pressures | Jun-07 | B |
| ScottishPower – Amarinth and Hayward Tyler keep the energy flowing Amarinth supply a dimensionally interchangeable vertical sump pump to ScottishPower's combined cycle gas turbine power station near Hoddesdon, Hertfordshire. ScottishPower were so pleased the proceeded to buy a second pump! | May-07 | A |
| The Ipswich Hospital NHS Trust - Amarinth performs painless replacement of fractional motor pumps Amarinth have designed a clever modification to old Girdlestone condensate recovery pumps using fractional motors. Amarinth's solution involves a low cost modern metric motor & requires no changes to system pipe work. | Feb-07 | A |
2006 | ||
| Axsia Serk Baker - Amarinth delivers an elegant solution for their nutshell filtration system NATCO choose Amarinth so supply C Series process pumps with open impellers to operate its nutshell filter package which treats oily water produced during the processing of oil and gas in a sour hydrogen sulphide environment. | Jun-06 | A |
| BP Exploration and Production - Amarinth upgrade poorly performing API 610 pump and increase reliability ten-fold Amarinth refurbish & upgrade existing API 610 pump on one of BP Exploration's FPSO's in the Schiehallion oil field in just 6 weeks. BP were so pleased they ordered a replacement for the standby pump an have not had any further problems with either pump. | Jun-06 | A |
| Polimeri Europa - Amarinth optimises pump design to prevent clogging of latex agglomerate Amarinth work closely with Polimeri & John Crane to design a centrifugal pump to pump latex agglomerate without requiring constant dismantling, cleaning & reassembly after each batch. Reliability improved by a factor of 15! | May-06 | A |
| Spirax Sarco - Amarinth designs Ci-Nergy, the standard variable speed condensate recovery unit Amarinth's Ci-Nergy variable speed condensate recovery unit is developed for Spirax Sarco, world leaders in steam management, to deliver significant operating cost savings and a compact space saving design using pressure sensing to manage condensate return rates to the boiler. | May-06 | A |
| Amarinth seals the leak for BP Chemicals with an innovative re-engineered one piece volute and suction cover Amarinth use re-engineering techniques to upgrade an existing Girdlestone pump component and make their part interchangeable with the original, providing BP Chemicals an elegant cost effective solution, without having to use reverse engineering. | Jan-06 | A |
2004 | ||
| MAS East help Amarinth achieve ATEX product compliance MAS East support Amarinth to help us achieve ATEX product compliance by using specialist consultants, Designplus (Engineering) Ltd | Jul-04 | A |
| Web enabler - seamlessly linking the web page to a manufacturing system Amarinth's web solution for linking your back office 123MRP system to your web page. Allow your customers to place orders, check stock & prices, and track the progress of their order via your web page. All with minimal manual intervention. | Jun-04 | A |
e-news | ||
2013 | ||
| March news letter Amarinth has been supplying API 610 pumps for over a decade and 2012 was another successful trading year with its fullest order book to date and the delivery of pumps into a number of prestigious projects worldwide. Further expansion to our team, new offices and recognition as a leading company within the region have placed the company in a strong position for 2013. | Mar-13 | A |
2012 | ||
| September news letter With a full order book and continuing growth Amarinth have announced key new appointments and expansion to the company. Amarinth focus on the Malaysian Oil and Gas markets and release new technical bulletins to highlight some of the key changes from API 610 10th edition to 11th. | Sep-12 | A |
2011 | ||
| November news letter Amarinth sign agency agreement with Padmasri Engineers in India & secures $300k order from Larson & Toubro. Amarinth identified GAS Arabian Services as its agent for Saudi Arabia and offer witness testing over the web to support pump delivery. | Nov-11 | A |
| May news letter Amarinth win further orders for Sahil & Shah fields as part of the Full Field Development Project in Abu Dhabi via Technicas Reunidas. Update on the Carbon Trust project for efficent impellers. New agency signed in India - Padmasri Engineers, plus update on the machinery directive re captive fasteners | Feb-11 | A |
2010 | ||
| April news letter Find out more about Amarinth's recent orders in the Middle East, the opening of our new assembly & pump test facility plus the launch of our industry leading new web based documentation management system. | Apr-10 | A |
2009 | ||
| August news letter Amarinth win a significant order for a Mega PTA plant in Portugal from Aker Kaverner. Carbon Trust awards Amarinth a grant to develop efficent pumps & Amarinth release 3D CAD models of API 610 pumps on our website. | Aug-09 | A |
| March news letter Find out more about Amarinth's participation at ADIPEC 2008, Galfar placing a $1m order for 10 API 610 VS4 vertical sump pumps, and Amarinth's new agent in Oman - Al Ansari. | Mar-09 | A |
2008 | ||
| October news letter Amarinth move into bigger offices to allow for future expansion, plus focusing on Low NPSH pump duties for FPSO applications along with our API 610 questionnaire | Oct-08 | A |
| March news letter Amarinth design pumps for Polimeri to pump Latex. Chris Ryan appointed Export Sales Manager to boost export sales & Sheldon Wilford appointed Northern Sales Engineer | Mar-08 | A |
2007 | ||
| April news letter Carolyn Hepburn appointed as North Western sales engineer, Nama appointed as Middle East agent in Abu Dhabi & wins $3.5m order for high alloy pumps, plus case studies realsed on website | Apr-07 | A |
2006 | ||
| September news letter Amarinth wins largest order to date from Wood Group for 10 filtration pumps to enable them to comply with OSPAR regulations, plus significant investments in power & craneage enhance testbay facilities | Sep-06 | A |
| February news letter Amarinth launch new interactive website offering more data & customer interaction, plus Amarinth aquires Protect System, an established manufacturer of Seal support systems to ISO & API standards. Also only 4 months to go for ATEX compliance. | Feb-06 | A |
2005 | ||
| December news letter Amarinth builds a reputation for supplying pumps to OSPAR regulations on FPSO's in the North Sea, plus find out about our new variable speed condensate recovery unit and our range of close coupled motor pumps that interchage with the Girdlestone pump range. | Dec-05 | A |
Press releases | ||
2013 | ||
| Amarinth looks at winterising pumps to work reliably in sub-zero temperatures Amarinth looks at lessons learned from ensuring its own API 610 pumps operate reliably in sub-zero temperatures and develops its own list of considerations in the absence of any industry standard definition for winterisation. | Mar-13 | A |
| Amarinth delivers API 610 OH2 pumps on a tight deadline to ProSep in Malaysia Amarinth delivers four API 610 OH2 pumps with Plan 53B seal support systems to ProSep in Malaysia on a tight 26 week deadline which have been deployed in the Petronas operated Kebangan field. | Feb-13 | A |
| Amarinth's focus on Iraq leads to its first order in the region from Global Process Systems (GPS) Amarinth's focus on Iraq leads to its first order in the region assisted by the appointment of Horizon Development International (Basra) as its agent. | Jan-13 | A |
2012 | ||
| Amarinth delivers state-of-the-art bearing flush monitoring system for ZADCO VS4 pumps Amarinth has delivered a state-of-the-art bearing flush monitoring system to ZADCO for API 610 VS4 pumps to prevent bearing failure caused by dry running and to reduce Health and Safety risks. | Nov-12 | A |
| Amarinth secures £550k order for North Sea Quad 204 FPSO Amarinth will supply the five API 610 OH2 A-Series super duplex pumps with Plan 53B buffer fluid seal support systems mounted on bespoke baseplates to the new Quad 204 floating production, storage and offloading (FPSO) vessel. | Nov-12 | A |
| Can a more cost effective API 610 VS4 pump deliver the duty instead of a VS1 pump Amarinth explains why companies who have always specified a VS1 pump should think about whether a more cost effective VS4 pump could meet the duty required. | Aug-12 | A |
| Amarinth secures a further $5.5m of pump orders in the Abu Dhabi region Amarinth has secured orders totalling $5.5m from the National Petroleum Construction Company (NPCC) in Abu Dhabi. | Jul-12 | A |
| Amarinth delivers innovative vertical pumping solution for Kumul Platform Amarinth has delivered an innovative open drain pumping solution to be installed in the caisson of the Kumul Oil Platform located 40km off the southern coast of Papua New Guinea. | Mar-12 | A |
| Using rotodynamic pumps for low shear, produced water applications Oliver Brigginshaw, Managing Director of Amarinth, explains how Amarinth is using state-of-the-art computer modelling techniques to design rotodynamic pumps for low shear applications. | Jan-12 | A |
2011 | ||
| Amarinth delivers high alloy pumps to ZADCO on short lead time for Zirku Island Amarinth delivers £750k of high alloy pumps to ZADCO on short lead time for Zirku Island | Nov-11 | A |
| Amarinth provides winterised pumps to the oil fields of remote Russia Amarinth provides winterised pumps to the oil fields of remote Russia | Oct-11 | A |
| Amarinth appoints Alex Brigginshaw as Business Development Director Amarinth appoints Alex Brigginshaw as Business Development Director | Sep-11 | A |
| Amarinth completes state-of-the-art API 610 pump testing facility Amarinth complete it's new test facilities providing additional capacity to handle its ever increasing orderbook | Jun-11 | A |
| Amarinth appoints Harry Coldrey as UK OEM Sales Manager Amarinth strengthen UK sales operation with appointment of Harry Coldrey, UK OEM Sales Manager bringing with him a wealth of expertise in instrumentation in the Oil & Gas industries. | May-11 | A |
| Amarinth gains Petronas approved vendor status Amarinth gains Petronas approved vendor status and signs Geveke Oil & Gas Malaysia as regional agent | May-11 | A |
| Amarinth wins first order in Saudi Arabia Amarinth secured an order from Saudi International Petrochemical Company (Sipchem) for an API 610 petrochemical pump that will be used for Ethylene Di Acetate transfer | May-11 | A |
| Amarinth welcomes leading Austrian engineer to its Carbon Trust project Amarinth welcomes Austrian Helmut Benigni, a leading engineer in the field of optimising pump performance, to work alongside the company on its high profile Carbon Trust project to develop a high efficiency centrifugal pump. | Jan-11 | A |
| Amarinth signs new agent in Saudi Arabia Amarinth further extended its presence in the Middle East by recruiting Gas Arabian Services as its new territory sales and marketing agent for the Kingdom of Saudi Arabia | Jan-11 | A |
2010 | ||
| Amarinth secures $300K order for pumps in the challenging Sahil and Shah oil fields in Abu Dhabi Amarinth secures an initial order for $300K of process pumps from leading Spanish engineering and construction company Tecnicas Reunidas for use the Sahil and Shah fields as part of the Full Field Development project in Abu Dhabi. | Dec-10 | A |
| Amarinth increases global coverage and signs new agent in India to target demanding applications Amarinth continues its global expansion by signing Padmasri Engineers as its agent in India and securing a $300K contract from Larsen & Toubro. | Nov-10 | A |
| Amarinth wins orders for 4M USD from Petrofac in the Middle East Amarinth secures orders from Petrofac totalling 4M USD for delivery by June 2010. The majority of the pumps are destined for the ASAB Full Field Development project in Abu Dhabi, the biggest on-shore project ever awarded. | Apr-10 | A |
| Amarinth moves one step closer to developing high efficiency centrifugal pump with Carbon Trust award Amarinth has successfully completed Phase 1 in developing a new process for manufacturing impellers optimised for best efficiency point to better match pumps to the customer’s duty point. The work is being supported through a grant from the Carbon Trust of £160,000. | Jul-10 | A |
| Amarinth bucks the recession and opens new assembly & test facilities Amarinth has just completed a new building that will house its state-of-the-art assembly facilities and provide an additional capacity of 150% over and above its existing facilities. | Apr-10 | A |
| Amarinth unveils industry leading document management system that could save contractors millions of pounds Amarinth unveiled its new document management system which promises to deliver significant benefits to contractors and operators, particularly those subject to penalty payments and retentions related to documentation. | Apr-10 | A |
2009 | ||
| Meeting the demands of FPSO vessels for low volume, high specification pumps on very tight deadlines Modern FPSO markets demand low volume, highly specified pumps on short leadtimes which poses real problems to traditional equipment manufacturers used to selling much higher volumes. | Nov-09 | A |
| Conflicting requirements of API 610 mean the best pump for a job may not always be selected Enquiries for pumps from the oil and gas industries normally refer to API 610, now ISO 13709, as the minimum technical standard. Amarinth looks at this combination of sometimes conflicting requirements of specifications and standards and explores why this can potentially lead to the best pump for the job not being selected. | Oct-09 | A |
| Amarinth improves collaborative working with detailed 3-Dimensional CAD models of pumps Amarinth launch an innovative new on-line service that gives access to detailed 3-Dimensional CAD models of its API 610 horizontal & vertical pumps | Sep-09 | A |
| Amarinth awarded Carbon Trust grant to develop high efficiency centrifugal pump Amarinth are awarded a grant from the Carbon Trust of £160,000 to develop a new process for manufacturing impellers optimised for best efficiency point to better match the pumps to the customer’s duty point. | Sep-09 | A |
| Amarinth provides API 610 OH2 and VS4 pumps for Petronas Carigali plant in Turkmenistan API 610 10th Edition Pumps installed on the Acid Gas Recovery Unit for the Turkmenistan Block 1 Development Project for Petronas Carigali despite diffcult trading conditions in the current economic climate. | May-09 | A |
| Amarinth secures 2M Euro order for 40 industrial process pumps from Aker Kvaerner for mega PTA Plant Amarinth has secured an order in excess of 2M euros from Aker Kvaerner for 40 centrifugal industrial process pumps to be supplied with sliding baseplates and API 682 plan 54 seal support systems to be used in the new mega PTA plant in Portugal. | Feb-09 | A |
2008 | ||
| Amarinth secures $1M API 610 vertical sump pump order at ADIPEC in Abu Dhabi Amarinth secured a $1M order from Galfar Engineering and Construction of Abu Dhabi for ten super duplex API 610 VS4 vertical sump pumps to be installed on the 'closed drains system modifications’ at the Bab Plant owned ADCO | Dec-08 | A |
| Amarinth halves the lead time on bespoke API 610 pumps with the help of RADAR Amarinth announce that its two year long investment in RADAR, a fully integrated design, manufacturing and support system, enables it to deliver bespoke API 610 exotic alloy pumps in just 26 weeks, halving the traditional lead time. | Oct-08 | A |
| Amarinth appoints new agent in Oman Amarinth strengthen its operations in the Middle East with the appointment of Al Ansari Trading Enterprise LLC as its agent in the Sultanate of Oman | Oct-08 | A |
| Balancing pump efficiency with NPSH is the key to delivering a cost effective package Oliver Brigginshaw, Managing Director of Amarinth, explains NPSH and how pumps can be cost effectively engineered to operate in a low NPSH environment. | Aug-08 | A |
| Solidworks 3D CAD modelling enables pump manufacturers success Amarinth celebrates 5 years of rapid growth, and attributes much of it's success to the application of Solidworks 3D CAD supported by Innova Systems | Jul-08 | A |
| Amarinth expand to gain a firm foothold in the Norwegian North Sea sector Amarinth appoint a new agent in the Scandinavian market, TUROteknikk AS of Norway. This new relationship has already yielded a significant order for 3 API 610 OH2 process pumps from DONG Energy, the Nordic’s leading energy group | Mar-08 | A |
| Amarinth continues to strengthen in the UK Sheldon Wilford is appointed as Northern area Sales Engineer to support Amarinth's expanding business in the UK | Mar-08 | A |
| Amarinth turns the most problematic pump at Polimeri Europa into its most reliable Amarinth's innovative engineering skills develop an advanced impeller and pump design for Polimeri Europa that allows latex coagulate to be pumped reliably thereby reducing equipment maintenance costs by a massive 83%. | Mar-08 | A |
| The application of modular design to bespoke products Amarinth invest significantly in Soildworks CAD to developing the world’s first modular vertical sump pump (API 610 VS4's) that significantly reduces lead-times of what is generally considered a totally bespoke product. Customer specific GA's & SA's can be produced within 4 - 6 hours rather than 4 weeks! | Jan-08 | A |
2007 | ||
| Amarinth consolidates in Middle East with another million dollar order Amarinth, working with its Middle East agent Nama Development Enterprises, has once again secured a significant order for its API 610 VS4 vertical sump pumps. Following a $3.5M order earlier this year, this new order of $1M has been placed by Consolidated Contractors International Company (CCC) for 3 high alloy vertical sump pumps for use in the Abu Dhabi Gas Industries Ltd (GASCO) on-shore oil operations at Habshan in the Emirate of Abu Dhabi. | Oct-07 | A |
| Amarinth appoints Nama as new Middle East agent and wins multi-million dollar order Amarinth has appointed Nama Development Enterprises as one of its growing number of agents based in Abu Dhabi, in the Middle East. This new relationship has already yielded a high profile $3.5M order for an number of high alloy API 610 VS4 vertical sump pumps. Amarinth's largest order to date. | May-07 | A |
| Creative impeller design from Amarinth keeps latex flowing Amarinth has designed and commissioned an innovative pumping solution for Polimeri Europa which prevents the frequent clogging inherent in the existing centrifugal pumps used to move latex agglomerate around the plant. The new pumps have increased reliability by a factor of 15 delivering a return on investment in just nine months | Jan-07 | A |
2006 | ||
| Amarinth pumps up its sales force in the North of the UK Carolyn Hepburn joins Amarinth from Emerson Process Management and will be focused on working with customers in the north of the UK. Following her degree in Industrial Technologies and Management, Carolyn gained a great deal of experience of the oil, gas and process industries through her work at Costain. | Dec-06 | A |
| Amarinth delivers innovative variable speed pumps into Axsia Nutshell Filters for Sonatrac Algerian fuel manufacturing company, Sonatrac, has commissioned two new Axsia Nutshell Filters at its Birbirkine site in Algeria. These are the first Axsia filters to incorporate an ingenious new variable speed pump based on the proven C Series pump designed by Amarinth. | Oct-06 | A |
| Variable speed technology reduces operating costs for steam heating & process systems Oliver Brigginshaw explains why the Ci-Nergy variable speed condensate recovery unit offers significant reduced operating costs compares with more traditional start, stop units | May-06 | A |
| Amarinth designs and launches Ci-Nergy - intelligent variable speed condensate recovery units Amarinth designs Ci-Nergy, a compact self sensing variable speed condensate recovery unit to deliver a combination of energy savings, space and cost reduction. The fact that the Ci-Nergy CRU costs less to manufacture than traditional units means that operators will get a return on their investment in just 6 to 9 months | Mar-06 | A |
2005 | ||
| Amarinth supplies Wood Group pumps for Amerada Hess to achieve OSPAR compliance Amarinth, wins a significant order from the Wood Group to supply 10 ATEX compliant low NPSH C Series process pumps, complete with John Crane upstream pumping mechanical seals. They are to be installed on the Amerada Hess Corporation operated Triton Floating, Production, Storage and Offloading (FPSO) vessel located in the North Sea to complete a filtration package to achieve OSPAR compliance. | Dec-05 | A |
| Amarinth acquires Protect System, manufacturer of seal support and buffer fluid systems Amarinth acquires Protect System, a UK company based in Chinnor, specialising in the design and manufacture of high quality seal support systems adapted to suit their customers specific needs. The products are designed and manufactured to PED 97/23/EC and ATEX EC-Directive 94/9/EC and are supplied alongside Amarinth's range of process pumps | Sep-05 | A |
| Amarinth keeps the lifeblood of the brewing & distilling industry flowing Wadworth & Company, brewers of the famous 6X, recently needed a pump in a hurry. Amarinth used its web-based ordering system to rush through a U Series industrial pump for use in the brewery process and keep the customer informed of progress along the way | Aug-05 | A |
| Amarinth secures major order from Pakistan Petroleum Amarinth deliver 10 off API 610 OH2 & VS4 process pumps incorporating John Crane laser faced seals to the Adhi Gas Processing Plant II to handle Liquid Petroleum Gas (LPG) at high suction pressures | Jun-05 | A |
| ATEX - in the zone If you manage equipment that is operating in a potentially explosive atmosphere, you have probably heard of ATEX. Oliver Brigginshaw offers a basic guide to ATEX so that you can ask the right questions, and understand the answers. | May-05 | A |
| Shell Training & Enterprise Program (STEP) students assist Amarinth with growth Shell Training & Enterprise Program (STEP) students Greg Aldham and Richard Morgan assist Amarinth on a 3 month student placement by developing a pump testing procedure & manual and assisting with the development of Amarinth's variable speed drive for the Ci-Nergy condensate recovery unit. | May-05 | A |
2004 | ||
| Re-engineering is an alternative to pump replacement Oliver Brigginshaw explains why re-engineering of pump parts provides end users with a superior alternative to some OEM parts which were originally designed years ago. Re-engineering offers design improvements whilst maintaining part interchangeability. It should not be confused with replication, which merely reproduces flaws in the original designs. | Sep-04 | A |
| Pump industries first full E-COMMERCE facility launched by Amarinth Amarinth, today announced the launch of their new e-commerce capability. This unique service within the pump industry allows customers to place orders and track every stage of the manufacture through to delivery, any time, anywhere in the word. | Jun-04 | A |
Publications | ||
2013 | ||
| Amarinth delivers four API 610 OH2 pumps with Plan 53B seal support systems to ProSep in Malaysia on a tight 26 week deadline which have been deployed in the Petronas operated Kebangan field. Your Industry News | Mar-13 | A |
| Amarinth has won its first order in Iraq – to supply 12 API 610 OH2 A-Series pumps for the Zubair Initial Production Facility and announces appointment of Horizon Development International (Basra) as its agent. Plant Engineer | Jan-13 | A |
2012 | ||
| Amarinth design unique bearing flush monitoring system for ZADCO API 610 VS4 pumps to prevent bearing failure caused by dry running and to reduce health and safety risks. Process Engineering | Dec-12 | A |
| Amarinth will supply the five API 610 OH2 A-Series super duplex pumps with Plan 53B buffer fluid seal support systems mounted on bespoke baseplates to the new Quad 204 floating production, storage and offloading (FPSO) vessel. Plant Engineer | Nov-12 | A |
| Amarinth has secured orders totalling $5.5m from the National Petroleum Construction Company (NPCC) in Abu Dhabi Technical Review | Aug-12 | A |
| Amarinth upgrades testing facilities to ensure that its products always meet the highest standards of performance and reliability World Pumps | May-12 | A |
| Amarinth provides an insight into the new challenges for the manufacturers to design equipment that can operate reliably in hostile environments Empowering Pumps | Apr-12 | A |
| Amarinth supplies pumps for Abu Dhabi water filtration system World Pumps | Jan-12 | A |
2011 | ||
| Amarinth raising the bar European Oil & Gas | Nov-11 | A |
| Amarinth delivers pumps to ZADCO for offsore pilot plant Offshore Energy Today | Nov-11 | A |
| Amarinth appoints new Business Development director and expands its board of directors Process Industry Informer | Sep-11 | A |
| Amarinth is to continue R&D on optimising impellers for best efficiency point Plant Engineer | Aug-11 | A |
| Amarinth completes new test facility providing additional capacity Plant Engineer | Jun-11 | A |
| Amarinth secures its first pump order in Saudi Arabia EIC | Jun-11 | A |
2010 | ||
| Amarinth increases global coverage and signs new agent in India to target demanding applications Process Industry Informer | Nov-10 | A |
| Amarinth expands into India World Pumps | Nov-10 | A |
| Manage equipment documents with ease Pipeline Magazine | Aug-10 | A |
| Best Effieiency Point pump impellers are one step closer Plant Engineer | Jul-10 | A |
| Amarinth improves collaborative working with
detailed 3-Dimensional CAD models of pumps
Total Engineering & Manufacturing | Jun-10 | A |
| Amarinth has unveiled a document management system for contractors and operators, particularly those subject to penalty payments and retentions related to product documentation. Processing talk | Jun-10 | A |
| Centrifugal pump manufacturer Amarinth has a new document management system in place that could deliver significant benefits to contractors and operators. World Pumps | Jun-10 | A |
| Pumped up and potent Pump Engineering | May-10 | A |
| Centrifugal pumps specialist Amarinth says it has invested in state-of-the-art assembly and test facilities to handle current orders and predicted growth. Plant Engineer | May-10 | A |
| Centrifugal pump manufacturer Amarinth has invested in new state-of-the-art assembly and test facilities in the UK to handle current orders and predicted growth. World Pumps | May-10 | A |
| Petrofac has ordered $4 million worth of specialist centrifugal pumps and associated equipment for the massive ASAB Full Field Development project in Abu Dhabi, from Amarinth for delivery by June. Plant Engineer | Apr-10 | A |
| Amarinth wins orders for $4m from Petrofac in the Middle East EIC | Apr-10 | A |
| Amarinth wins US$4 million Middle East pump order from Petrofac World Pumps | Apr-10 | A |
2009 | ||
| Amarinth launch 3D pump CAD models EIC | Dec-09 | A |
| API 610 standard still forcing sub optimal pump selection SOE Society of Operations Engineers | Dec-09 | A |
| High specification pumps on short leadtimes for FPSO vessels The Journal of Industry & Technology | Dec-09 | A |
| Meeting demands of FPSO vessels for low volume high specification pumps OilOnline | Nov-09 | A |
| Variable speed technology reduces operating costs for condensate recovery units The Chemical Engineer | Nov-09 | A |
| Conflicting requirements of API 610 can be problematic for ideal pump selection The Journal of Industry & Technology | Nov-09 | A |
| Oliver Brigginshaw of Amarinth discuses API 610 Processing talk | Oct-09 | A |
| New impellers to cut pump costs SOE Society of Operations Engineers | Oct-09 | A |
| Amarinth improves collaborative working with
detailed 3-Dimensional CAD models of pumps & Amarinth awarded Carbon Trust grant The Journal of Industry & Technology | Oct-09 | A |
| Amarinth goes public on Solidworks 3D CAD customer viewing Manufacturing Computer Solutions | Sep-09 | A |
| Meeting the demands of FPSO vessels for pumps Processing talk | Sep-09 | A |
| Amarinth wins Carbon Trust grant to develop high efficency centrifugal pump World Pumps | Sep-09 | A |
| Carbon Trust backs energy efficient pumping technology Cleantech group LLC | Sep-09 | A |
| Amarinth gets manufacturing boost from Carbon Trust Control Engineering UK | Sep-09 | A |
| Amarinth provides API 610 pumps for Petronas Carigali plant in Turkmenistan Oil & Gas News | Aug-09 | A |
| Designing a solution for pumping latex World Pumps | Aug-09 | A |
| Amarinth replaces Girdlestone Pumps for BFS Processing talk | Jul-09 | A |
| Amarinth feasability study Integrated Products Manufacturing | Jun-09 | A |
| Amarinth secures 2M Euro order for 40 industrial process pumps from Aker Kvaerner for mega PTA Plant EIC | Apr-09 | A |
| Amarinth wins large order for industrial process pumps World Pumps | Mar-09 | A |
| Amarinth wins large order for Portugese PTA plant Processing talk | Feb-09 | A |
| Centrifugal pumps The Engineer | Feb-09 | A |
| Sump pumps Industrial Plant & Equipment | Jan-09 | A |
2008 | ||
| Galfar buys 10 API 610 vertical sump pumps Processing talk | Dec-08 | A |
| Amarinth secures 1m USD API 610 vertical sump pump order at ADIPEC in Abu Dhabi AMEinfo | Dec-08 | A |
| Pump Suction Plant Engineer | Nov-08 | A |
| Amarinth appoints new agent in Oman Processing talk | Oct-08 | A |
| Amarinth cuts bespoke pump leadtime Processing talk | Oct-08 | A |
| Solidworks Technology enables pump manufacturers success The TCT magazine | Oct-08 | A |
| How to avoid pump caviation Building Sustainable Design | Sep-08 | A |
| Balancing pump efficiency with NPSH Control Engineering UK | Aug-08 | A |
| Pump designs optimised for offshore duty Processing talk | Jul-08 | A |
| Plant Engineer You pays your money | Jun-08 | A |
| Major sump pump order from Abu Dhabi Processing talk | May-08 | A |
| Polimeri problem pump is now it's most reliable Process Engineering | May-08 | A |
| Amarinth partners TUROTeknikk for Scandinavian market Offshore magazine | May-08 | A |
| Management moves Process Engineering | Apr-08 | A |
| Amarinth pump The Engineer Online | Apr-08 | A |
| Polimeri Europa pump European Plastic Product Manufacturer (EPPM) | Apr-08 | A |
| Latex pump at Polimeri is now most reliable IDS Water | Mar-08 | A |
| Amarinth pumps up orderbook Offshore247.com | Mar-08 | A |
| Sump pumps head East Industrial Plant & Equipment | Mar-08 | A |
| Modular solution Industrial Plant & Equipment | Mar-08 | A |
| Modular design for vertical sump pumps Processing talk | Jan-08 | A |
2007 | ||
| Amarinth pumps for Abu Dhabi The Engineer Online | Oct-07 | A |
| Amarinth gets million dollar order Control Engineering Middle East | Oct-07 | A |
| Amarinth appoints Nama as new Middle East agent World Pumps | Jun-07 | A |
| Creative impeller design from Amarinth keeps latex flowing Design Products & Applications | Jan-07 | A |
2006 | ||
| Amarinth delivers innovative variable speed pumps into Axsia Nutshell Filters for Sonatrac Design Products & Applications | Oct-06 | A |
| Amarinth fuels its growth with acquisition of Protect System Essentials for Industry | Feb-06 | A |
| ISO9001 2000 - Not simply form filling Essentials for Industry | Feb-06 | A |
| Amarinth selected to design OSPAR complaint pumping solution for the Amerada Hess operated triton FPSO The Chemical Engineer | Feb-06 | A |
| Amarinth designs pumping solution for North Sea FPSO vessel Hydraulics & Pneumatics | Jan-06 | A |
2005 | ||
| Amarinth's products and services IEN Europe | Nov-05 | A |
| Amarinth announces the acquisition of Protect System The Engineer | Nov-05 | B |
| Amarinth offers web based quick order response BDI | Aug-05 | A |
| In the Zone, a guide to ATEX H&V News | Jul-05 | A |
| Amarinth supply Pakistan Petroleum Ltd 10 bespoke pumps Industrial Plant & Equipment | Jul-05 | A |
| New pumps from old Process Engineering | May-05 | A |
2004 | ||
| A quality result - Amarinth achieves ISO9001 2000 certificate Spirax Sarco News | Mar-04 | A |